Anybody had this happen?

There is some law of nature that large groups of my yoyos need maintenance at the same time. I consistently have 10+ yoyos on the bench awaiting: sili, bearing cleaning/replacement, or new string. With the sili I tend to wait and apply to several yoyos at the same time(assembly line style).I prefer silicone over pads anytime.