SO MANY WIRES.
This is only the barebones setup, too. We’re gonna have to run MORE wire when we get the second panel installed. Oh and we are gonna need to add a third panel as a subpanel dedicated to the machines themselves at some point because we will otherwise have too many individual conductors in the wireway to be up to code. When that happens I’ll be needing to rip out all the wiring I did into the pallet racks to reverse the lengths ![]()
Going has been slow because I’ve just been wiped at the end of most days, but things are coming along.